
NexGold Intersects 9.30 g/t Gold Over 11.0 Metres and 2.31 g/t Gold Over 21.5 Metres at the Goldlund Deposit, Ontario
TORONTO, Feb. 25, 2026 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to provide additional results from the recently-announced diamond drilling program, which comprises up to 25,000 metres at the Goliath Gold Complex (comprised of the Goliath, Goldlund and Miller Deposits). The drill program is focused on the Goldlund Deposit, with holes designed to infill and potentially expand open pit mineral resources. The results presented in this news release include 1,883 metres of diamond drilling in five drill holes (GL-25-009 to GL-25-011, GL-25-013 and GL-25-014) that specifically infill mineralization areas located within, or near the base of, the open pit Mineral Resource and generally within the current Inferred category within Zone 4 mineralization (Figure 1; Table 2).








